EARTH GROUNDING
RESISTANCE TESTING
by AKT INVEST
✓ ANRE authorized◷ Fast response📍 Timișoara & Timiș County

EARTH GROUNDING
RESISTANCE TESTING

Timișoara & Timiș County

Safety for people. Continuity for your business.

We test earth electrode resistance and perform electrical safety measurements for electrical, industrial and photovoltaic installations.

Testing and verification services

Earth electrode resistance testing

Measurement of earth electrode resistance (Ω) using professional test equipment.

Protective conductor continuity testing

Verification of protective conductor and bonding continuity.

Electrical safety / PRAM testing

Testing according to applicable requirements and installation specifics.

Photovoltaic systems

Grounding and protection system testing for PV installations.

Lightning protection testing

Testing of lightning protection systems.

Industrial solutions

Testing for halls, factories, industrial sites and complex installations.

ANRE authorizations and compliance

Work performed by qualified personnel using professional verified test equipment and measurement documentation.

  • Qualified and experienced personnel
  • Professional test equipment
  • Complete documentation

Relevant legislation and standards

Ordinul ANRE nr. 134/2021I7-2011 (modificat prin Ordinul 959/2023)HG 1146/2006Legea 319/2006

Exact requirements depend on the type of installation and field of activity.

Why choose AKT INVEST?

👥 Experience in residential, commercial and industrial projects🛡 Compliant work⚙ Professional equipment▤ Clear and complete report◷ Fast scheduling

How does the testing work?

1

Scheduling

Contact us by phone, WhatsApp or using the form.

2

On-site testing

We perform measurements using professional equipment.

3

Results analysis

We interpret the values and check compliance.

4

Measurement report

You receive the documentation included with the contracted service.

Request a personalized quote

We respond as quickly as possible based on your project requirements.

By submitting, you agree to be contacted regarding this request.

FAQ

How long does a measurement take?

Duration depends on the installation, number of test points and access to the earth electrode. We confirm the estimate when scheduling.

Will I receive a report?

Yes. For contracted services that include documented results, the corresponding report is provided.

Do you travel within Timiș County?

Yes. We confirm availability and travel cost when you contact us.